Lydon

HOMEOWNER CHECKLIST

The electrical walkthrough is easier when the owner has already thought about daily routines, furniture, equipment, and future plans. Use this checklist before rough-in, then confirm the details with the builder and electrical contractor.

Best approach: Walk the plans room by room. Mark what needs power, what needs control, what may be added later, and what would be difficult to change after drywall.

Whole-home decisions

  • Service and panel locations
  • Whole-home surge protection and smoke/CO alarm plan
  • Internet, networking, doorbell, cameras, and low-voltage pathways
  • Exterior lighting, holiday-light receptacles, and landscape power
  • Generator, battery, solar, and EV-charging possibilities
  • Detached garage, shed, well, septic, or future addition

Kitchen and dining

  • Appliance model numbers and electrical requirements
  • Island and countertop receptacles
  • Under-cabinet, pantry, and task lighting
  • Dedicated locations for coffee, beverage, or specialty appliances
  • Pendant and dining-fixture locations relative to cabinets and furniture

Living spaces and bedrooms

  • TV, audio, and data locations
  • Floor receptacles where walls are not nearby
  • Bed, desk, and furniture layouts
  • Ceiling fan boxes and control preferences
  • Switched receptacles, dimmers, and three-way switching

Garage, shop, and outdoors

  • EV charging now or a pathway for later
  • Freezers, tools, welders, compressors, or hobby equipment
  • Garage-door openers and workbench outlets
  • Exterior receptacles, soffit outlets, and security lighting
  • Power for patios, pools, hot tubs, or outdoor kitchens

Mechanical and utility areas

  • HVAC, water heater, pumps, and treatment equipment
  • Laundry equipment and countertop needs
  • Clear working space around panels and service equipment
  • Wall area for future solar, battery, or generator equipment

Three questions for every room

  1. What will be plugged in here?
  2. How will lighting be controlled when entering and leaving?
  3. What could realistically change in five or ten years?

Code sets minimum safety requirements. A good plan also supports how the building will actually be used. Selections still need to be coordinated with the permit set, applicable codes, utility rules, and project budget.

Turn the checklist into a coordinated plan

Bring your marked plans and equipment list to the electrical conversation early. Learn how Lydon approaches new construction or send us your project details.

Electrical & new construction: 608-269-3013. Solar planning: 608-633-0423.