Commercial solar planning
A useful commercial solar proposal starts with the facility—not with a target panel count.
Before requesting pricing, a business, nonprofit or public institution can save time by gathering the information that determines whether solar is practical. A feasibility review should connect the property, electrical system, energy use, ownership goals and decision process.
1. Define the organization’s objective
- Reduce purchased electricity over time
- Improve budget predictability
- Use available roof or land productively
- Support sustainability, education or community goals
- Prepare for EV charging, electrification or expansion
- Add resilience for selected critical loads
Different objectives can lead to different system sizes, equipment and ownership structures. Document the priority before comparing proposals.
2. Collect the right energy data
Monthly totals are a starting point. Larger or more complex facilities may also benefit from interval data showing when electricity is used. Identify energy charges, demand charges, fixed charges, seasonal rates and any separate meters.
See how to read a commercial electric bill for solar for a field-by-field review.
3. Evaluate roof, land and parking areas
- Roof type, age, warranty and structural information
- Available roof area after access paths and equipment
- Shade and future obstructions
- Drainage, snow management and maintenance access
- Ground area, setbacks, trenching route and future land use
- Parking areas that might support a solar canopy
4. Review the electrical service
Document service voltage, phase, main equipment ratings, meter locations, transformers and available drawings. A commercial array may require utility studies, protective equipment or service modifications. These items belong in feasibility—not as a surprise after a contract is signed.
5. Identify upcoming changes
New production equipment, building additions, refrigeration, electric heating, EV charging or additional shifts can change the value and appropriate size of a system. Planned roof replacement can change the construction schedule. A facility expected to be sold or vacated should be evaluated differently from a long-term owner-occupied site.
6. Map the decision process
Identify who must approve the project: owner, board, lender, landlord, municipality, procurement team or other stakeholders. Establish the desired budget cycle and whether competitive bidding is required.
Commercial solar feasibility checklist
☐ 12+ months of electric bills
☐ Interval data, if available
☐ Roof drawings and warranty information
☐ Site plan and future expansion areas
☐ Electrical one-line or service photos
☐ Planned load changes
☐ Ownership and financing constraints
☐ Decision-makers and approval timeline
☐ Utility account and rate information
☐ Project goals ranked by importance
7. Separate feasibility from promises
An early concept is not a final engineering package or utility approval. A trustworthy proposal should label assumptions and explain what still requires verification. Review how to compare solar companies and proposals and explore completed Lydon solar projects.
Bottom line
The strongest commercial projects begin with good inputs. Collecting the information above produces better designs, clearer pricing and fewer late-stage changes.
Start with a practical feasibility review
Lydon Electric & Solar can review the facility, electrical service, energy data and project objectives before developing a proposal.
Last reviewed October 30, 2026. Feasibility, utility requirements and financial results are site-specific.