How to Compare Solar Companies and Proposals
The best solar company is not the one with the biggest claim or the
lowest first payment. It is the company that evaluates the property,
explains the design, discloses the full price and assumptions, completes
compliant electrical work and remains accountable after the system is
operating.
Use the same questions for every company. A side-by-side comparison
is far more useful than a list that declares one installer “best.”
Before requesting proposals
Gather:
- 12 months of electric bills
- The name of the serving electric utility
- Plans for an EV, heat pump, addition or other new load
- Roof age and known roof concerns
- Your ownership and financing goals
- Whether outage backup is a requirement
Ask each company to evaluate the same goals. Otherwise, the proposals
may be different products disguised as a price comparison.
Twelve questions to
ask every solar company
1.
Who is responsible for the electrical design and installation?
Solar is electrical work. Ask who holds the required credentials, who
will be onsite and whether subcontractors are used. Wisconsin licensing
is overseen by the Department of Safety and Professional Services, and
local permits may add requirements.
2.
Will you inspect the property before issuing a final proposal?
Remote imagery is useful for early planning. A final scope should
account for roof or ground conditions, shade, electrical service,
equipment access, structural needs and trenching where applicable.
3.
What system size and first-year production are you proposing?
The proposal should show DC system size in kilowatts and estimated
annual production in kilowatt-hours. Ask what weather data, shade,
orientation, losses and degradation assumptions were used.
4.
Which utility rules are included in the savings model?
Verify the utility, applicable tariff, net-metering threshold or
buyback rate, export treatment and fixed charges. The Wisconsin Public
Service Commission makes clear that utility rules and purchase rates
vary.
5. What is the gross cash
price?
Get the price before rebates, tax assumptions or financing. If
financing is offered, request:
- Cash price
- Financed principal
- Interest rate and term
- Dealer or origination fees
- Total of all payments
- Prepayment terms
Compare total cost, not just the first monthly payment.
6. What is included—and
excluded?
The scope should address permits, interconnection, trenching,
structural work, service or panel upgrades, monitoring, consumption
metering, roof work, restoration and possible change orders.
7. What equipment will be
installed?
Ask for model numbers for panels, inverters, racking, batteries and
monitoring. Then compare compatibility, service access and warranties.
“Premium” is not a specification.
8. Who stands behind each
warranty?
Separate:
- Manufacturer product warranty
- Panel performance warranty
- Inverter or battery warranty
- Installer workmanship warranty
- Roof-penetration coverage
Ask what happens if the original installer is unavailable and how
warranty labor or shipping is handled.
9. What will the
system do during an outage?
A typical grid-connected solar system shuts down when the grid is
out. If backup is promised, the proposal should identify the battery,
controls, backed-up loads, usable capacity and power limits.
10.
Who handles permits, utility interconnection and inspection?
The contract should assign responsibility and explain what the owner
must provide. Ask about the expected sequence: design, permit,
installation, inspection, utility approval and permission to
operate.
11. What
local projects and references can you show?
Ask for recent work that resembles your project: roof type, ground
mount, battery, utility or system size. Original project photos and
reachable references are more informative than stock images.
12. What happens after
commissioning?
Ask who monitors alerts, how to request service, typical response
expectations, who owns portal access and what documentation you receive.
You should keep the final design, equipment list, warranties, permits,
interconnection approval and commissioning records.
Red flags to take seriously
Wisconsin DATCP advises consumers to research contractors, get more
than one estimate, be cautious of unusually low bids, verify incentive
claims independently and avoid high-pressure tactics.
Pause if a salesperson:
- Says the program is “free” without a written explanation
- Guarantees the electric bill will disappear
- Will not disclose the cash price or total financed payments
- Uses an incentive that cannot be verified on an official source
- Pressures you to sign immediately on a tablet
- Will not provide equipment model numbers or production
assumptions - Dismisses roof, shade, electrical or utility questions
- Cannot explain who performs and warrants the work
Wisconsin law may provide a three-business-day right to cancel
certain contracts signed at the home; DATCP’s current guidance explains
the conditions. Read the contract and cancellation notice carefully.
A simple proposal scorecard
Score each proposal from 0 to 2 on every line: 0 = missing, 1 =
partly clear, 2 = clear and documented.
| Category | Score |
|---|---|
| Site and electrical evaluation | /2 |
| System size and layout | /2 |
| Production model and assumptions | /2 |
| Utility tariff verification | /2 |
| Gross cash price | /2 |
| Financing total and fees | /2 |
| Complete scope and exclusions | /2 |
| Equipment model numbers | /2 |
| Warranty and service process | /2 |
| Local proof and references | /2 |
| Total | /20 |
The score does not replace judgment, but it exposes missing
information before the contract makes it expensive to ask.
Why Lydon publishes this
checklist
Homeowners deserve to understand what they are buying. Lydon Electric
& Solar’s role is to evaluate the property, design the electrical
system and explain the tradeoffs plainly. If a proposal cannot stand up
to a fair comparison, it should not be signed.
Request a residential solar
evaluation
Continue your solar research
- What changes the cost of residential solar?
- How residential solar power systems work
- Are solar panels worth it in Wisconsin?
- Wisconsin solar incentives explained
Frequently asked questions
How many solar quotes should
I get?
Wisconsin DATCP recommends more than one estimate. Two or three
comparable site-specific proposals can reveal important differences
without turning the process into a race to the lowest number.
Is NABCEP certification
required?
NABCEP credentials are voluntary industry certifications, not a
substitute for required licenses or permits. They can be one useful
signal of solar-specific training. Verify the people and credentials
involved in the actual project.
Is the lowest
cost per watt the best proposal?
Not necessarily. Cost per watt helps normalize price, but scope,
production, equipment, electrical work, financing and service
responsibility can make two proposals fundamentally different.
Should I
choose a national or local solar company?
Judge both by the same evidence: who designs and installs the system,
who holds responsibility, how service works, whether local utility
requirements are understood and whether recent customers can verify the
experience.
Can an installer
guarantee my savings?
Be cautious. Weather, household use, utility rates and export rules
change. A responsible company documents assumptions and ranges rather
than presenting a forecast as certainty.
Top Wisconsin Solar Energy Company